About Us – Beijing-Based Equipment Integrator

What we supply

Package substations, the cabinets and systems inside them, and the item-level BOM behind every configuration. Three routes into the range — choose the level of detail you need.

YB series package substation — Package Substation

Substations

Six package-substation families for urban, industrial, mining and renewable projects, configured from the drawing and supported by routine-test documents.

Explore the range →
High-voltage switchgear cabinet — Package Substation

Components

High-voltage and low-voltage assemblies, transformers, enclosures and auxiliary parts — the five systems that make up every station.

See the systems →
Low-voltage distribution board — Package Substation

BOM Library

Detailed material groups, model-level entries and specification points for each item, from HV breakers to busbars and cable terminations.

Browse the BOM →

Our Quality Control Process

The same sequence runs whether the order is one replacement breaker or a complete substation, so the documents at the end match the drawing at the start.

01

Inquiry

Single-line diagram, kV, kVA, site conditions and applicable standard reviewed

02

Matching

The right enclosure and five systems selected against the drawing

03

Drawing Freeze

Configuration fixed; dimensions and parameters verified before build

04

Production

Assembly, internal wiring and compartment build to the agreed drawing

05

Inspection

Routine test and pre-shipment QC with photographs

06

Delivery

Export documents and logistics to the project destination

Testing and Inspection Capabilities

A unit leaves as a tested assembly, not as a set of parts. The routine test, the document set and any witnessed inspection are fixed with the order and recorded against the as-supplied configuration.

ParameterTypical value
Routine testPer IEC 62271-202 before shipment; scope fixed with the order
Type-test evidenceMatched to the configuration actually supplied
Customer witnessArranged by agreement before shipment
DocumentsGA drawing, wiring diagram, BOM and routine test report

Industries We Serve

The same hardware is specified very differently by site. Pick the application closest to yours to see the deciding input — footprint, protection, ventilation or flameproofing.

Urban & Commercial

Compact footprint in place of a conventional distribution room

Industry & Mining

High-reliability supply and flameproof units for hazardous areas

New Energy

Step-up and grid-connection for photovoltaic and wind plants

Infrastructure

Supporting power for transport and municipal projects

Rural & Remote

Dispersed loads where a civil-built room is impractical

Temporary Supply

Relocatable units for construction and emergency power

Where the Numbers Come From

Every parameter table names its basis. Either the designation carries the value (KYN28A-12/630-25 is 12 kV, 630 A, 25 kA), or the standard fixes it (GB/T 17467, IEC 62271-202), or the value is marked as scheme-dependent and confirmed at quotation. Nothing is stated at a precision the drawing does not support.

ParameterTypical value
Prefabricated assemblyGB/T 17467 · IEC 62271-202
Medium-voltage switchgearIEC 62271-200
TransformerIEC 60076 / GB/T 1094
LV assemblyIEC 61439
Enclosure ingressGB/T 4208 — IP54 standard

What you can expect from the project coordinator

Package Substation works as a Beijing-based power transmission and distribution equipment integrator. The role is to read the single-line diagram, clarify the electrical and site inputs, coordinate the package configuration with the production partners, and keep the drawings, BOM and handover documents aligned.

Configuration review

Voltage, transformer rating, protection, enclosure and site conditions checked before quotation.

Written scope

Supply boundary and key assumptions stated in the quotation and project documents.

Document coordination

Drawings, BOM, routine-test scope and delivery documents kept against the agreed configuration.

Need this quoted?

Send the single-line diagram and the site conditions. You get back a configuration, a bill of materials and a scope of supply — in writing, at quotation.

Request a quotation

Frequently asked questions

QWho coordinates a project from enquiry to delivery?
A

Projects are coordinated from Beijing by a power transmission and distribution equipment integrator: one team reads the single-line diagram, fixes the configuration with the production partners, and stays with the drawings and documents through to handover.

QHow does a single-line diagram become a delivered unit?
A

It starts from the single-line diagram: the five functional systems are selected, the parameters are frozen against the drawing, and the bill of materials follows from that. Assembly, wiring and routine testing are held to the same drawing, and the delivery date is fixed with the order.

QWhat information do you need before quoting?
A

Four inputs: the single-line diagram, the voltage and kVA, the site conditions, and the standard the project will be audited against. Everything else follows from those.

QWhich standards apply to a prefabricated substation?
A

GB/T 17467 and IEC 62271-202 for the prefabricated assembly, IEC 62271-200 for MV switchgear, IEC 60076 / GB/T 1094 for the transformer, IEC 61439 for the LV assembly and GB/T 4208 for enclosure ingress. Type-test evidence must match the configuration actually supplied.

QWhat is the difference between a compact substation, a kiosk substation and a prefabricated substation?
A

They are name variants for the same class of factory-assembled MV/LV distribution unit. Compact and kiosk substation are the usual English terms; prefabricated substation is the wording used in IEC 62271-202. The enclosure style and compartment layout are what actually differ between products.

QIs a unit substation the same as a package substation?
A

Yes — unit substation is the term used in IEC and in North American specifications for the same factory-assembled MV/LV distribution unit. In Europe and Asia the common names are package substation, compact substation and prefabricated substation under IEC 62271-202.

QCan an RTU substation or control and monitoring substation be configured?
A

Yes. An RTU substation adds a remote terminal unit, metering and communications to the LV and auxiliary compartments. Send the protocol, the point list and the utility requirement with the single-line diagram; protection settings and the control and monitoring substation layout follow from them.

Package Substation

Specialized in package substations, switchgear cabinets and distribution components for global B2B projects. Configuration and bill of materials are fixed against the single-line diagram; assembly, wiring and routine test follow that drawing.

6 / 10 / 35 kV · 100–3150 kVA · IP54+

© 2026 Package Substation. All rights reserved.PrivacyContactmanager@packagesubstation.com
Scroll to Top